Preparing the house for more
Had so much work stuff to settle after the hari raya holiday that i was on the phone almost the whole morning that i barely got time to tell my plumber stuff. but yeap it was pretty neatly done so i was quite happy with it

Common bathroom...i have a nagging feeling that the ikea glass shelf bracket will rust some day soon....shouldn't have trusted this ikea stuff. but it's nice leh...

Master bathroom..my plumber fitted in the sink cabinet legs for us (coz we couldn't do it without the drill tools) and did the little stuff like cut a hole for the outlet pipe to go through the cabinet, and drilled in the mirror cabinet as well.
and things can go wrong...like this.

where did the cover go??? gosh i wonder if it got thrown away when they were clearning the debris the last time :S
and the floor buffering guys came to buffer off the wax off our pretty homogeneous tiles. mostly all homogeneous tiles have a layer of wax to protect the tile during the renovation process (where a lot of work will be done and might damage the floor)...so it needs to be buffered off..after the reno. now our floors looks so glossy and clean. quite happy. :)
no more wearing shoes in the house liao.

i came back in the afternoon to check on things and just nice, the floor decking got delivered. but there was some defect, a bottom part was chipped and so the wood was exposed. i know it's the bottom and i won't see it but i just thot i wanted to be the 'particular' owner and got them to exchange a new one for me (which they were very nice to do so..tomorrow). otherwise i somehow wouldn't care less...actually coz it's kinda mafan. but i thought it would be good lah...otherwise if anything happens next time it'll be more mafan...i don't want the wood to be rotting away next time because of this defect. moreover they delivered it dirty (it must have been on the ground because of the sand and some mud) and wet (because it was raining today).
then we went all the way to jalan besar to buy the shower metal rack from SongCho (aka chicken brand).

it is whopping expensive...just a 20cm one costs $46 liao. we saw a similar one at Homefix for $10+. these are one of the items in the house we hope will last a long long long time. anyway they guarantee 100% anti-rust...lifetime. and if it really does rust, they'll check it and 'unrust' it or replace a new one. so i trust it should last well, the one at my mum's place is still almost rust-free so far.
anyway there were quite a few hiccups. like my cleaner who only came at 5pm to clean. but that's ok. and the parquet guy thot he'll be doing the final varnish another day..so realized that the parquet varnishing isn't the final coat yet. oops...have to get him down on friday to do it then.
moving day set. November 4.

0 Comments:
Post a Comment
<< Home